Abstract:For the bottom concrete construction of the foundation structure of elevated pile cap,we use the steel sleeve box with the load-bearing characteristic as the concrete construction template,and adopt an integral load-bearing system process to realize the modular assembly and integral installation.The process can not only meet the stiffness requirement,but also be easy to install and disassemble to shorten the construction time.