水运工程施工单位企业定额发展现状及分析
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Present situation and analysis of enterprise quota of water transport engineering construction enterprises
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对企业定额在国内水运工程施工单位企业管理中使用率低、准确率低、编制水平低的问题,进行企业定额发展状况研究,并与国外先进施工企业发展理念进行比较,分析制约企业定额发展的主要因素,提出成立预算管理部门、数据收集注重时效性、实行数据库动态管理等发展企业定额的措施,为充分发挥企业定额的重要作用提供理论依据。

    Abstract:

    In view of problems concerning enterprise quota of domestic water transport engineering construction enterprises such as low utilization rate,low accuracy and low level of compilation,we carry out a research on the development of enterprise quota ,and compare it with that of the advanced construction enterprises abroad.Analyzing main factors restricting the development of the enterprise quota,we put forward some measures for the enterprise quota development including setting up of budget management department,data collection timeliness,dynamic data management,etc.to provide a theoretical basis for giving full play to the important role of the enterprise quota.

    参考文献
    相似文献
    引证文献
引用本文

张忠谊,许 兵.水运工程施工单位企业定额发展现状及分析[J].水运工程,2017(11):41-44.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2017-11-17
  • 出版日期:
文章二维码