    摘要:

    建立了甬江河道及口外海域平面二维潮流泥沙数学模型,对2015年6月半个月的潮流场和悬沙场进行模拟,模拟结果与实测资料吻合良好。计算得到了研究区域洪季的余流场和输沙格局,结果表明:甬江口外余流整体由西北指向东南,河道余流指向下游;除口门局部水域,甬江口外输沙格局基本与余流场一致,悬沙经涨潮流的作用被带入甬江河道,致使河道内近口门处的输沙格局由口门向内;甬江口局部区域输沙格局与余流场存在差异的原因是悬沙输移与潮流运动存在时间上的滞后

    Abstract:

    This paper presents a 2D tidal current and suspended sediment model which takes the Yongjiang River and the out sea area as the key research area.The model is adopted to carry out numerical simulation of tidal current and suspended sediment movement of half a month in the concerned area in June 2015.A good agreement is found between the observation data and computed results.Analysis on the computed residual current and sediment transport pattern in the flood season shows that the residual current generally causes transport from northwest to southeast in the out sea area,and seaward transport in the river.The sediment transport pattern is almost in accordance with the residual current pattern except local regions at the estuary.The sediment is transported into the Yongjiang River by the flood current and the net sediment transport direction near the estuary is towards the upstream.The local difference between the residual current and sediment transport patterns at the Yongjiang Estuary is because of the time lag between the tidal current and suspended sediment movement.

    参考文献
    相似文献
    引证文献
引用本文

蒯 宇,陶建峰,张 青,等.甬江及口外海域潮流泥沙数值模拟*[J].水运工程,2017(7):58-67.