    摘要:

    滨州港3万吨级航道工程土质具有颗粒细、密实、极硬等特点,绞吸船施工该土质时,存在绞刀电机电流波动幅度大、正刀施工容易跑刀、横移锚容易走锚、生产率较低等问题。为有效解决上述问题,通过对比分析绞吸船不同绞刀形式、调整挖掘进尺、优化施工关键参数、查找排泥管线额外阻力等方法,使绞吸船绞刀电机电流波动幅度下降,改善了正刀施工容易跑刀现象,横移锚不再走锚,生产率提高了约15%,节约施工成本的同时也缩短了工期。

    Abstract:

    In Binzhou port 30 000 ton waterway project,soil has fine grain,and is dense and extrahard .There were some problem when CSD dredged the soil,which were that the cutter motor current fluctuated,and it was easy to hob when the cutter rotates in the same direction as the movement direction,and the shifing anchor might drag,and the productivity was low.To solve the above problems,we compared and analysed the cutter type,and adjusted excavation footage,and optimized the construction of key parameters,and found the pipeline additional resistance.Fluctuation amplitude of the cutter motor current was decreased.The frequency of hobbing and dragging was reduced.The productivity increased by about 15%.The construction costs was saved,while the time limit for the project was shortened .

    参考文献
    相似文献
    引证文献
引用本文

刘昊,杨正军.滨州港3万吨级航道工程绞吸船施工问题的排除与工艺优化[J].水运工程,2017(2):182-185.