Abstract:The revetment engineering of transformation and relocation project in Dalian port eastern region (tender I) is the first one adopting cylinder gravity structure on soft soil in Dalian area.Combinations of multiple loading time and magnitudes are compared and demonstrated in the design and verified by the site monitoring result during construction,which indicates that the monitoring data is under control and the engineering quality satisfies the prospective requirement.