鱼梁航运枢纽工程闸坝泥岩基础剪切软弱带加固处理
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


The reinforcement treatment to shear weakness zone in the mudstone foundation of gate dam in Yuliang navigation junction project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    鱼梁航运枢纽工程闸坝基础开挖过程中发现岩层中层间存在剪切软弱带且节理裂隙较为发育,岩体完整性较差;同时,层间剪切软弱带、节理裂隙面、岩层面等结构面互相切割,组合形成大小不一的块体,对坝基抗滑稳定较为不利,经计算,深层滑动不满足规范要求。经多方案对比分析研究,最终采用挖除部分软弱夹层、布设锚筋桩和基础固结灌浆等措施组合的地基处理方案。

    Abstract:

    In the process of excavating the foundation of gate dam in Yuliang navigation junction project,it is discovered that the shear weakness zone exists in the middle of rock stratum and the joint fissure is relatively developed;the integrity of rock mass is relatively bad.Meanwhile,the structural surfaces such as interlayer shear weakness zone,joint fissure surface and rock surface mutually cut each other and form into different size of blocks which are unfavorable to the anti-sliding stability of dam foundation.The deep-layer sliding doesn’t meet the standard requirements through calculation.After contrastive analysis and study on many schemes,the comprehensive foundation treatment scheme is adopted by combing with measures such as excavating partial weak interlayer,laying anchor pile layout and grouting the foundation for consolidation.

    参考文献
    相似文献
    引证文献
引用本文

朱卫国,曾尚洁.鱼梁航运枢纽工程闸坝泥岩基础剪切软弱带加固处理[J].水运工程,2016(8):145-150.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2016-08-18
  • 出版日期:
文章二维码