Inspection method for deepwater non-bottom protection thin-layer riprap construction
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    深水区域的无护底薄层抛石结构应用日趋广泛,但现有规范的验收方式难以有效适应实际情况。结合长江口12.5 m深水航道一期工程白茆沙一标段新建闸区域的无护底抛石施工3个阶段的典型段施工,对无护底水下抛石施工技术和质量控制进行系统的分析,为类似工程提供借鉴。

    Abstract:

    The application of non-bottom protection thin-layer riprap structure in the deep water area is increasingly widespread,but the inspection and acceptance for it stipulated in the existing code is difficult to adapt to the actual situation effectively.Based on the typical construction in the non-bottom protection thin-layer riprap construction in the 12.5 m Yangtze estuary deepwater channel phase I project Baimaosha bid I newly-built lock area,we carry out a systematic analysis of the construction technique and quality control of non-bottom protection thin-layer riprap,so as to provide reference for similar projects.

    参考文献
    相似文献
    引证文献
引用本文

莫建波,陈 翔.深水无护底薄层抛石施工验收方法[J].水运工程,2016(7):6-10.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2016-07-12
  • 出版日期:
文章二维码