透水框架护岸模型试验
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Experimental study on bank protection by penetrating frame
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    透水框架护岸是将透水框架铺设在岸坡坡面上,利用透水框架的减速促淤机理来防护岸坡。本试验开展了四面六边透水框架和扭双工字型透水框架铺设在岸坡坡面上的试验研究,对其护岸效果、减速促於机理进行分析,了解透水框架护岸的优缺点,分析透水框架护岸的应用部位。

    Abstract:

    To protect the slope,penetrating frames,which have the effect of deceleration and accretion promotion,are laid on the slope surface for bank protection.Carrying out the experiments of bank protection by laying tetrahedron-like penetrating frame and twist double H permeable frame on the bank slope surface,we analyze the effect of bank protection and mechanism of deceleration and accretion promotion and recognize the advantages and disadvantages and the applying position of bank protection by penetrating frames.

    参考文献
    相似文献
    引证文献
引用本文

况宏伟,谷祖鹏,雷国平,等.透水框架护岸模型试验[J].水运工程,2016(3):112-119.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2016-03-17
  • 出版日期:
文章二维码