横向深水梳式滑道井字梁及轨道安装技术
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Beam & girder and rail mounting technology for deep transverse comb slideway
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    武船滑道项目井字梁及轨道安装区域处于长江主航道一侧,水深流急,水下轨道安装精度要求高,安装工期压力大。介绍井字梁预制、井字梁预拼装、水下井字梁安装等工序中施工与过程测量控制相结合的技术,为今后类似梳式滑道工程提供借鉴。

    Abstract:

    The beam & girder and track installation works of Wuchuan slipway project is just on the main stream side of the Yangtze River where the water is deep and swift.According to the characteristics mentioned above,and due to the difficulties of high accuracy requirement of underwater track installation as well as the tight time limit,we combine the construction and measurement in the process of grillage beam prefabrication,assembly and installation,to provide reference for similar comb type slipway engineering.

    参考文献
    相似文献
    引证文献
引用本文

张玉龙,唐如蜜,谭永安.横向深水梳式滑道井字梁及轨道安装技术[J].水运工程,2015(8):144-147.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2015-08-12
  • 出版日期:
文章二维码