SMW工法止水帷幕在船坞工程中的应用
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Application of SMW method cut-off wall in dock engineering
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    止水帷幕是船坞工程中的关键部位,是有效隔断水源确保船坞安全的根本保障。止水帷幕的合理选择直接影响船坞的质量和工程造价。常规止水帷幕均存在一定的缺陷,如钢板桩价格高,高压旋喷桩漏水点多,因此新型帷幕的研究应用势在必行。详细论述SMW工法在船坞坞墙和坞口基坑工程中的设计应用及工程实效,为类似工程提供借鉴。

    Abstract:

    As a key part in dock engineering,the cut-off wall is the foundation to make sure that dock can be operated safely against water.The choice of the kind of cut-off wall impacts tremendously the dock quality and project cost.Normal cut-off walls have certain flaws such as high price of the steel sheet pile,many leaks of high-pressure jet grouting pile,etc.So,it is imperative to research and apply new-type curtain walls.This paper describes the first application and construction effect of SMW method cut-off wall used in dock wall and foundation pit of dock head,which may serve as reference for similar engineering.

    参考文献
    相似文献
    引证文献
引用本文

黄振瑜. SMW工法止水帷幕在船坞工程中的应用[J].水运工程,2015(4):205-208.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2015-04-14
  • 出版日期:
文章二维码