    摘要:

    在土体满足承载力的要求下,沉降量是地基处理过程中的主要控制标准之一。在多哈新港码头两种典型的地基上分别设计大型堆载试验,通过较长时间的沉降观测,得到了地基土的最终沉降值,同时结合CPT试验,运用分层总和法及参数反演法分析不同土层的压缩模量,并进行沉降预测,为本项目及类似工程的地基土沉降量预测提供依据。

    Abstract:

    When the bearing capacity of ground is satisfactory,the settlement is one of the other main criteria for the ground improvement.In Doha new port project,two embankment tests are designed respectively for two types of ground improvement areas,by which the settlement of each point after a long time is obtained.The settlement combined with CPT results is to be analyzed by splitting summation method and parameters inversion method to get the constrained modulus of the soil and then predict the ground settlement.The method presented provides a basis for this project and future similar projects.

    参考文献
    相似文献
    引证文献
引用本文

陈 胜,邱青长,廖宏志.基于CPT试验联合大型堆载试验的地基沉降预测与分析[J].水运工程,2015(3):57-60.