荆江河段高滩守护工程护底排边缘冲刷试验研究
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Experimental study on scouring at edge of bed protection mattress of high-beach protection engineering in Jingjiang reach
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对长江中游荆江河段复杂的水沙条件和地形条件,建立概化水槽模型,对高滩守护工程护底排边缘冲刷开展试验研究。分别研究了不同流速、压载条件、排体长度对冲刷坑最大深度和水下稳定边坡系数的影响,提出了荆江河段高滩守护护底排边缘水下冲刷坑的计算公式,并确定了不同工况条件下荆江河段水下稳定边坡系数宜取0.5,为高滩守护工程护底排长度的确定奠定了基础。

    Abstract:

    The flow,sediment and topographic conditions of Jingjiang reach in the lower Yangtze River are complex.Establishing a flume model,we carry out an experimental research on the edge scouring of bed protection mattress in Jingjiang reach,including the effects of velocity,ballast condition and bed protection mattress width on the maximum depth and the underwater slope stability coefficient.We also put forward a new scouring depth calculation formula.The underwater slope stability coefficient is determined to be 0.5 in Jingjiang reach.The research provides an important basis for the determination of the length of the bed protection mattress.

    参考文献
    相似文献
    引证文献
引用本文

黄成涛,白 明,李 彪,等.荆江河段高滩守护工程护底排边缘冲刷试验研究[J].水运工程,2014(12):151-155.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2014-12-18
  • 出版日期:
文章二维码