Abstract:At the end of every element of tunnel in a large tunnel engineering,there fit with nearly 42.2 m maximum height of manhole and measurement tower,which bear force by water load,wave load and wind load in transportation and placement.Adding a clamp structure to form a rigid connection with the measurement tower,we ensure the safety and accuracy.