    摘要:

    王道航运枢纽是小清河航道复航的关键性工程。通过分析王道航运枢纽的平面制约因素,提出3个总体布置方案,并从河流弯道、桥梁改建方案、船闸平面布置、对沿河设施的影响以及工程投资等方面进行对比分析,结果显示左岸、右岸方案桥梁跨径大,工程投资高,移闸方案桥梁跨径最小,工程投资最低,船闸布置更为合理,为最优方案。

    Abstract:

    Wangdao navigation junction is the key project of recovering navigation in Xiaoqinghe Channel.Based on the analysis of the restrictive factors for Wangdao navigation junction,we compare three layout schemes from such aspects as the river bend,bridge construction,the plane layout for ship lock,influence on riverside facilities,and the project investment.The results indicate that the scheme of moving check gate has the least bridge span length,the lowest project investment in all of the schemes,and the layout for ship lock is more rational.So it’s recommended as the optimal scheme.

    参考文献
    相似文献
    引证文献
引用本文

杨尊伟,戈国庆,耿 卓.小清河王道航运枢纽总体布置最优方案比选[J].水运工程,2014(4):116-120.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2014-04-16
  • 出版日期:
文章二维码