Abstract:This paper studies the current situation of runway pavement of Juba International Airport and analyzes the damage causes of the pavement. Combining with construction requirements under condition of nonsuspending air service, according to the special climate characteristics of Juba International Airport, this paper determines the upgrading plan and proposes construction measures. It is of great significance for the asphalt concrete pavement’s upgrading construction based on the existing asphalt concrete surface.