    摘要:

    结合近年来国内实施的若干个滨海核电厂设计实例,从核电厂海域工程构筑物承担的防洪、取排水和大件吊卸 运输等功能展开论述,重点分析厂址防洪与厂坪高程、护岸高程设计之间的关系,不同取排水方式的优缺点和适应性,取 排水构筑物常用的平面布置方式及所考虑的取水安全、温排水、潮流、泥沙和波浪等因素,大件码头平面布置考虑的因素。

    Abstract:

    Based on several design cases of nuclear power plants in China, this paper expounds the the function of flood protection, intake and outlet and heavy-cargo unloading and transportation undertaken by the marine engineering structures of nuclear power plants, analyzes the relationships among flood protection, site elevation and revetment elevation design; the advantage, disadvantage and adaptability of different intake and outlet types, the common general layout of intake-outlet structures and water safety, warm water discharge, tide, sand, waves and other factors considered; as well as factors in the general layout of heavy cargo wharf.

    参考文献
    相似文献
    引证文献
引用本文

张 俊,李秀英,杨云兰,等.滨海核电厂海域工程总平面布置设计要点[J].水运工程,2014(2):130-135.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2014-02-20
  • 出版日期:
文章二维码