    摘要:

    安谷枢纽工程以筑坝获取水头,并采用长尾水渠进一步增加水头发电,电站尾水渠与通航共用一渠。运用数模 计算的方法,研究了尾水渠通航条件等技术问题。研究了电站机组增(减)负荷产生的非恒定流尾水渠水流运动规律、尾 水渠水力要素与机组启闭时间、流量的关系,提出了改善措施。

    Abstract:

    Angu hydroelectric project gains hydraulic head with damming, and applies long tail channels to further increase hydraulic head, which also consider navigation. Utilizing the method of mathematical modeling, this paper carries out the research on technical problems such as increasing hydraulic head and hydraulic navigation condition, etc. According to the relationship between the unsteady flow tailrace water flow movement rule, tailrace hydraulic requirements, wave height, gradient, flow velocity caused by changing load on power plant units and unit opening and closing time, flow rate, this paper puts forward the improving measures, which may serve as reference for relevant professional design.

    参考文献
    相似文献
    引证文献
引用本文

左旋峰,卢文蕾.长尾水渠中电站日调节下泄水流运动规律[J].水运工程,2014(1):134-139.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2014-01-15
  • 出版日期:
文章二维码