    摘要:

    连云港港旗台港区10万吨级散化泊位后方西围堤为在港区原防波堤的基础上经爆破挤淤抛石施工工艺拓宽形 成,受形成条件限制,形成的堤身下部存在淤泥层,需进行加固处理。通过对不同加固处理方案的比较分析,确定了最终 实施方案,节约了工程投资,满足工程施工和使用期安全稳定的要求。

    Abstract:

    The west breakwater behind Lianyungang Qitai port’s 100 000-ton bulk berth is formed on the basis of the original breakwater by blasting riprap construction process. Restricted by the formation conditions, the lower part of the breakwater is the silt layer which needs to be reinforced. Based on the comparative analysis of different reinforcement processing programs, we determine the final scheme which can not only reduce the project investment, but also meet the requirements of both construction and stability during construction.

    参考文献
    相似文献
    引证文献
引用本文

杨华东,魏凤龙.连云港港旗台港区10万吨级散化泊位后方西围堤加固方案比选[J].水运工程,2014(1):81-85.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2014-01-15
  • 出版日期:
文章二维码