Abstract:Reliability is carried out on frame pier,s pile foundation based on Monte Carlo method and taking the moment effects the control condition. It is found that under combined effect of seven working conditions, the reliability index of each pile can basically meet the specification requirements. Although all bored piles′diameter is 1600mm, the reliability index of pile 1~4 is too large, thus it is suggested to optimize on the pile foundation .