    摘要:

    电吹船是沿海匡围造地主要施工船舶,具有吃水浅、机动灵活、成本低、工况适应能力强等优点。随着匡围 工程规模的不断扩大,所需吹砂距离也随之增长,以至电吹船自身吹距不能满足施工需求。为解决施工长距离吹砂技术难 点,从沿管线增加接力泵方式着手,并基于上海浦东机场商飞配套五跑道陆域区堆载体工程实践研究,得到粉细砂条件 下,船机泥泵功率与长距离管道吹距的比例关系,不仅可确定接力泵配备合理位置,解决长距离管道吹砂技术难点,而且 达到节约施工成本、提高施工效率的效果。

    Abstract:

    The electric-hydraulic dredger is the major construction ship during the land reclamation project which has advantages of shallow draft, flexibility, lower cost and great adaptability. With the continuous expansion of the inning project, the sand-blowing distance required increases, but the blowing distance of the electric-hydraulic dredger itself cannot meet the construction needs. In order to solve the technical difficulty of the long-distance construction, we increase the relay pump along the pipeline. Meanwhile, according to the auxiliary loader project of the Fifth Commercial Aircraft Runways in Shanghai Pudong airport , we obtain the proportional relationship between the pump power and the long-distance pipeline under the condition of the fine sand. It can not only determine the reasonable position of the relay pumps to solve the technical difficulties of the long-distance construction, but also cut down the construction cost, and improve the efficiency of construction efficiency.

    参考文献
    相似文献
    引证文献
引用本文

孙卫平,陈德春,莫建波.电吹船长距离管道吹砂施工效率研究[J].水运工程,2013(9):194-198.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2013-09-18
  • 出版日期:
文章二维码