港珠澳大桥岛隧工程隧道基础沉降计算及参数选取
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Settlement calculation method and parameters selection of tunnel foundation for island-tunnel project of HZMB
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    港珠澳大桥岛隧工程隧道基础采用了多种基础形式,包括PHC刚性桩复合地基、高压旋喷半刚性桩复合地基、挤密砂桩柔性桩复合地基及天然地基基础。结合《建筑地基基础设计规范》、《建筑地基处理技术规范》以及《Technical standards and commentaries for port and harbor facilities in Japan》对上述复合地基及天然地基的沉降计算方法和参数选取进行分析,比较得出挤密砂桩复合地基沉降计算应符合《Technical standards and commentaries for port and harbor facilities in Japan》,PHC刚性桩复合地基沉降计算应符合GB50007—2012《建筑地基基础设计规范》,高喷桩复合地基沉降计算宜符合《建筑地基处理技术规范》水泥土搅拌桩的规定,天然地基沉降应考虑应力历史的e-lgp沉降计算方法以及次固结沉降计算应选取与实际应力相符试验条件下的次固结系数。概述岛隧工程隧道不同基础加固形式的沉降计算方法及沉降计算参数选取原则,为类似工程沉降计算提供参考。

    Abstract:

    Tunnel foundation for island-tunel project of HZMB using a variety of foundation forms, including PHC rigid pile composite foundation, high pressure jet grouting pile composite foundation, sand compaction pile composite foundation and natural foundation. In this paper, the composite foundation and natural foundation settlement calculation methods and parameters selected is analyzed with Code for design of building foundation, Technical code for ground treatment of building and Technical standards and commentaries for port and harbor facilities in Japan, which indicates that the sand compaction pile composite foundation settlement calculation should refer to Technical standards and commentaries for port and harbor facilities in Japan, PHC rigid pile composite foundation settlement calculation should follow the Code for design of building foundation GB50007—2012, high-pressure jet pile composite foundation settlement calculation should comply with Technical code for ground treatment of building provisions of cement mixing pile, natural foundation settlement should consider stress history e - lgp settlement calculation method and secondary consolidation coefficient for settlement calculation should match the actual stress test. This article outlines settlement caculation methods and parameters selection principle of different foundation treatment methods for the HZMB island tunnel works, to provide reference for similar projects in settlement calculations.

    参考文献
    相似文献
    引证文献
引用本文

李建宇,梁 桁.港珠澳大桥岛隧工程隧道基础沉降计算及参数选取[J].水运工程,2013(7):84-89.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2013-07-19
  • 出版日期:
文章二维码