Abstract:The scheduling of lock is a multi-objective nonlinear programming problems, the main task is to determine what vessels and their respective row in the relative position of lock. In order to solve this problem, the mathematical model of this problem is constructed and through the research scheduling algorithm, experimental proof the utilization ratio of lock chamber is increased and the working efficiency is improved.