    摘要:

    基于上海长江隧道工程,用数值模拟方法对隧道穿越堤防时的堤顶面沉降规律进行了研究。研究发现,隧道半径和隧道收敛率对堤顶面沉降的影响相对简单,而堤身弹性模量、隧道上覆土层厚度、隧道间距对堤顶面沉降的影响相对复杂;堤顶面沉降随隧道半径和隧道收敛率的增大而增大;隧道正上方堤顶面最大沉降和最大差异沉降随堤身弹性模量的增大而减小,最后趋于一稳定值;隧道正上方堤顶面最大沉降和最大差异沉降开始时都随着隧道上覆土层厚度的增大而减小,当覆土厚度大于20 m之后堤顶面沉降减小幅度趋缓;在隧道间距小于10 m时两隧道之间的堤顶面沉降随隧道间距的增大而增大,而在两隧道间距大于10 m时堤顶面沉降随隧道间距的增大而减小;堤顶面最大沉降和最大差异沉降都和隧道间距呈S形关系。结果表明,当隧道穿越堤防时,可采取增大堤身弹性模量、减小隧道收缩率、采用适当的隧道半径、覆土厚度和间距来减小堤顶面沉降。

    Abstract:

    Based on Shanghai Yangtze River tunnel, the settlement rules of dike top plane were studied when tunnel penetrate dike with numerical simulation method. It is found that the radius and convergence rate of tunnel have relative simple influence on settlement of dike top plane, while elastic modulus of dike, thickness of soil clay uplapping tunnel and distance between two tunnels have relative complicated influence on settlement of dike top plane; the settlement of dike top plane increase when the radius and convergence rate of tunnel increase; the maximal settlement and maximal difference settlement of dike top plane right above tunnel decrease when the elastic modulus of dike increase, and tend to a steady value; the maximal settlement and maximal difference settlement of dike top plane right above tunnel decrease when the thickness of soil clay uplapping tunnel increase, and then decrease slowly when the thickness of soil clay uplapping tunnel is over 20 m; the settlement of dike top plane increase with the increment of distance between two tunnels when the distance is less than 10 m, and it is inverse when the distance is over 10 m; the maximal settlement and maximal difference settlement of dike top plane have S shape relation with the distance between two tunnels. The following conclusions can be drawn that the measures such as enlarging the elastic modulus of dike, reducing the convergence rate of tunnel, taking appropriate radius, thickness of soil clay uplapping tunnel and distance between two tunnels, in order to reduce the settlement rules of dike top plane when tunnel penetrate dike.

    参考文献
    相似文献
    引证文献
引用本文

蒋建平.隧道穿越堤防时的堤顶面沉降规律研究*[J].水运工程,2013(3):22-30.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2013-03-25
  • 出版日期:
文章二维码