Abstract:Though serious average accident in chemical terminal is a small-probability event, it will cause serious consequences, and there is no relevant experience. Based on the average accidents in Tianyuan chemical terminal approach bridge, this article describes the key driving technology of the steel pipe pile beside the damaged approach structure and supporting unstable structure by special steel corbel to implement not only emergency repair of the approach but also permanent restoration. The technology may serve as reference for emergency repair in similar projects.