Practice of EPC project of Shanghai Yangtze River Bridge VTS navigation system
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    在上海长江大桥VTS导航系统工程建设中,采用勘察、设计、建造施工、设备安装与调试、试运行与维护管理等多阶段总承包(EPC工程),是一种有益的尝试与探索,在投资受限、工期紧、协调工作量大、各阶段交叉关系密切的情况下,这种模式对保证工程质量与最大效率作用显著。介绍上海长江大桥VTS导航系统工程总承包的实施体会。

    Abstract:

    The EPC project of Shanghai Yangtze River Bridge VTS navigation system includes multiple stages such as survey, design, construction, equipment installation and commissioning, trial operation, maintenance and management, etc. It is of beneficial use to try and explore. Under the circumstance of limited investment, tight schedule, heavy workload for coordinating, various stages with close relationship, this method guarantees the project quality and maximum efficiency. This article provides the views on the EPC experience of Shanghai Yangtze River Bridge VTS navigation system project.

    参考文献
    相似文献
    引证文献
引用本文

阳建云.上海长江大桥VTS导航系统工程总承包实践与探索[J].水运工程,2012(12):97-100.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-12-11
  • 出版日期:
文章二维码