卸煤码头升级改造设计要点
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Designing essentials in upgrading engineering of coal unloading terminal
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为了节约岸线资源,保证港口作业安全,实现港口的可持续发展,对旧有码头进行升级改造是目前水运设计行业面临的重要课题。以广东地区广州珠江电厂、深圳妈湾电厂、东莞沙角A电厂卸煤码头升级改造为例,阐述和分析了设计中遇到的结构方案、装卸工艺和码头附属设施等主要问题和解决方法,为类似工程提供参考和借鉴。

    Abstract:

    In order to save the coast line resource and guarantee the safety of port operation so as to realize the sustainable development of the port, the upgrading and renovation to the existing wharf tends to be a significant issue of water transport design industry. Taking the renovation project of Guangzhou Zhujiang Power Plant, Shenzhen Mawan Power Plant, Dongguan Shajiao Power Plant A as a study case, this paper analyzes the main problems and solutions concerning the structural plan, handling technology, and wharf auxiliary facilities in the design, hoping to serve as a reference for similar engineering projects.

    参考文献
    相似文献
    引证文献
引用本文

何建腾.卸煤码头升级改造设计要点[J].水运工程,2012(11):102-106.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-11-20
  • 出版日期:
文章二维码