Discussion on problems about inland river quota in middle-lower Changjiang waterway regulation project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    内河定额自1998年颁布以来,在长江中下游航道整治工程中得到了广泛的应用,对工程费用的控制取得了良好的效果。随着时间的推移,内河定额也暴露出施工船机偏小、人工费单价偏低、施工机械化水平不足和新结构、新材料定额满足不了实际需要的问题。针对这些问题进行探讨以提出解决办法,使内河定额更好地为长江航道整治工程服务。

    Abstract:

    The inland river quota was used widely in the middle-lower Changjiang waterway regulation project since promulgated from1998, and achieved good results at cost control. The inland river quota also exposed some problems, such as smaller construction ship and machine, lower labor cost unit price, and lower construction mechanization level. Moreover, new structure and new material quota can’t meet the real demand. Related solutions for these problems are proposed based on a discussion, which can provide reference for the improvement of the inland river quota and serve the Changjiang waterway regulation project better.

    参考文献
    相似文献
    引证文献
引用本文

汤光新.内河定额在长江中下游航道整治工程中若干问题的探讨[J].水运工程,2012(10):111-114.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-11-02
  • 出版日期:
文章二维码