    摘要:

    唐山港曹妃甸港区煤码头续建工程规模大、质量要求高,为了提高工程质量和施工效率,在施工中积极采取可调节轨道螺栓技术、GPS水下夯实定位技术及混凝土防裂等新技术、新工艺及新材料,保证了工程耐久性,提高了工程观 感质量,加快了施工速度,缩短了施工工期,节约了施工成本,取得了良好的经济和社会效益。

    Abstract:

    Tangshan Caofeidian coal port terminal construction project is a large-scale project with high quality requirements. In order to improve the quality of the projects and the efficiency, we actively use technical methods of adjustable track bolts, GPS system to locate underwater compaction, and anti-crack concrete. We also use some new materials, which guarantee the structures’ durability and appearance qualities, speed up the construction process , shorten the construction period and cost , and achieve the organic combination of economic and social benefits.

    参考文献
    相似文献
    引证文献
引用本文

朱颖波,王 中.唐山港曹妃甸港区煤码头续建工程施工新技术[J].水运工程,2012(9):178-181.