Abstract:The integral steel sleeve box is characterized by low efficiency and high cost. Considering construction of one hundred more abutments in Xiangjiang river Changsha comprehensive hub lock project, we design a new-type combined prestressed steel sleeve box, which applies the prestressed steel wire to combine the pieces of steel sleeve boxes into integrity. By this way, all operation of steel sleeve boxes are transferred from underwater to overwater. At present, 120 abutments of various shapes have finished construction, which evidence the good effect and indicate extensive application perspective.