堆载预压20 d前后土层的物理力学指标对比分析
DOI:
CSTR:
作者:
作者单位:

中交第二航务工程勘察设计院有限公司 广州分公司,广东 广州 511442

作者简介:

通讯作者:

中图分类号:

基金项目:


Contrast of physical and mechanical indicators of soil before and after 20 days with surcharge preloading
Author:
Affiliation:

Guangzhou Branch, CCCC Second Harbor Constructants Co., Ltd., Guangzhou 511442, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    堆载预压是最常用的地基处理方式,但以往对堆载后短时间内加固效果缺少检测分析。根据南方某港集装箱堆场软基处理工程实测资料,对堆载20 d后土的物理、力学指标变化与土层深度的关系进行了比对研究,对其它类似工程的设计、施工有参考和借鉴意义。

    Abstract:

    Surcharge preloading method is most commonly used in ground treatment. But the detection analysis in shortly time after the reinforcement effect is lacked. This paper analyzes the relationship between the soil physical, mechanical indicators and the soil depth after 20 days of surcharge preloading, based on the measured data of soft soil treatment in a container yard of South China. It may provide a reference for the design and construction of similar reclamation engineerings.

    参考文献
    相似文献
    引证文献
引用本文

陈维涛.堆载预压20 d前后土层的物理力学指标对比分析[J].水运工程,2012(5):139-140.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-06-19
  • 出版日期:
文章二维码