Abstract:Taking Shenzhen airport relocation project as a study case, this paper expounds the plan layout,technological scheme and wharf structure design of the port. In view of the ship type characteristics and the detail problems in operation of No.1 finger pier of Shenzhen airport passenger wharf, and considering the optimization design of No.2 finger pier’s structure, this paper presents a summarization and analysis of related problems and special utilization requirements, to serve as a reference for similar engineering designs.