Abstract:Focusing on the soft foundation and adjacent first phase project restrictions of the second phase levee project of Baogang Majishan port, this paper conducts levee ground treatment and upper structure study, to probe in to the levee options selection, sand pile foundation treatment, confronting thick middle sand layer design and levee connection section design between different ground treatment methods.