长江口疏浚土在横沙东滩吹填工程中的应用
DOI:
CSTR:
作者:
作者单位:

中交上海航道勘察设计研究院有限公司,上海200120

作者简介:

通讯作者:

中图分类号:

基金项目:


Application of Yangtze estuary dredged material to Hengsha east shoal reclamation projects
Author:
Affiliation:

Shanghai Waterway Engineering Design and Consulting Co., Ltd., Shanghai 200120, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    长江口深水航道疏浚工程每年产生大量的疏浚土,与此同时横沙东滩吹填工程需要大量的吹填土,二者的有机结合不仅可解决吹填土资源不足的问题,又可实现疏浚土的综合有益利用,为互利共赢之举。结合横沙三期吹填工程和横沙六期吹填工程实例,阐述了该类吹填方案设计原则和设计情况,并对今后的广泛应用提出相关建议。

    Abstract:

    A lot of dredged materials are produced in the Yangtze estuary deepwater channel dredging project. Meanwhile, a large quantity of filled materials is needed in Hengsha east shoal reclamation projects. So the combination of the projects can not only overcome the shortage of filled materials, but also make the beneficial use of dredged materials. It is a win-win situation. Based on the relative design principles, this paper gives two examples, i.e. Hengsha reclamation project phase 芋and phase 遇. Moreover, some suggestions are given on the further applications in the future.

    参考文献
    相似文献
    引证文献
引用本文

季岚,唐臣,张建锋,等.长江口疏浚土在横沙东滩吹填工程中的应用[J].水运工程,2011(07):163-167.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-05-23
  • 出版日期:
文章二维码