漳州港古雷港区南2# 化工码头工程方案技术分析及经济比选
DOI:
CSTR:
作者:
作者单位:

中交第二航务工程勘察设计院有限公司,湖北武汉430071

作者简介:

通讯作者:

中图分类号:

基金项目:


Technical analysis and economic comparison of Zhangzhou port area south Gulei No.2 chemical wharf engineering
Author:
Affiliation:

CTE-Wuhan Design & Consulting Corp., Ltd., Wuhan 430071, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    码头工程方案的选择除了其结构形式以外,很大程度上取决于工程造价的高低。根据漳州港古雷港区地形、地质、水文等自然条件,结合整个港区的规划,对漳州港古雷港区南2# 化工码头工程港工建筑物提出2 个方案,并对其进行技术分析及经济比选,从而综合确定推荐方案。

    Abstract:

    The wharf engineering scheme selection depends largely on the height of engineering cost besides the structure. According to the natural conditions of Zhangzhou port Gulei port area including the topography, geology and hydrology, etc., and considering the port planning, this paper presents two schemes for the hydraulic structures of No.2 chemical wharf engineering in Zhangzhou port Gulei port area, and carries out the technical analysis and economic comparison, so as to determine the recommended scheme.

    参考文献
    相似文献
    引证文献
引用本文

杨莹.漳州港古雷港区南2# 化工码头工程方案技术分析及经济比选[J].水运工程,2011(04):77-80.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-05-28
  • 出版日期:
文章二维码