It is important for pile engineers to formulate an economic, rational, efficient pile construction program and to avoid the concrete pile damage while driving. The pile driving control methods based on the wave theory are studied through the successful application using GRLWEAP analysis and the whole-process PDA. The comparative analysis aims at providing a technological reference for the pile driving construction and quality control.