- [1]LU You-peng and YANG Ji-chao.宁德某一级渔港水域布置[J].Port & Waterway Engineering,2018(1):83-87.
- [2]QIN Wei-chun.Dredging construction key points of Taipingkou waterway[J].Port & Waterway Engineering,2017(S2):59-62.
- [3]LIAN Shishui,WANG Zhibin,WANG Geng,WANG Chongxian.阳江闸坡世界级渔港水域布置设计要点[J].Port & Waterway Engineering,2024(5):67-74.
- [4]HU Xin, ZHANG Chang-yang.Design Standard of a Breakwater in Eastern Guangdong[J].Port & Waterway Engineering,2006(B09):87-88,91.
- [5]QI Xiao-hui,CHEN Hao-qun,JIN Ming-hua and LIU Bi-rong.连云港港徐圩港区防波堤工程平面布置研究[J].Port & Waterway Engineering,2013(10):64-72.
- [6]ZHOU Jing-zi,FENG Hai-bo.Optimization design of general layout and entrance proposal for Guang'ao breakwater of Shantou harbor[J].Port & Waterway Engineering,2012(5):56-59.
- [7]DENG Lei,LI Yong-ye.Layout of breakwater for the coal terminal in Huaneng Haimen Power Plant[J].Port & Waterway Engineering,2011(9):128-132.
- [8]SHEN Chen,SUN Lu,BAO Jian-yu,XUE Tian-han,QI Yue,WANG Da-chuan,DING Wen-tao and CHEN Mo.Construction scale of Caofeidian LNG terminals and navigation efficiency adaptability[J].Port & Waterway Engineering,2019(12):70-74.
- [9]LI Xiao-chong,ZHANG Hong-yan.Layout pattern of artificial island of Qisha port area of Fangcheng port[J].Port & Waterway Engineering,2012(5):34-37.
- [10]ZHANG Wei and GENG Cong.徐圩港区环抱式港池最大流速研究*[J].Port & Waterway Engineering,2012(9):35-39.
- [11]GAO Lang.越南沿海海港工程部分水域平面尺度优化[J].Port & Waterway Engineering,2020(5):138-142.
- [12]ZHENG Fan, MA Ren-hong.Layout Planning of Tieluwan Petrochemical Pier District at Gaolan Port Area[J].Port & Waterway Engineering,2006(B09):71-73.
- [13]Qiao Guanyu,Yuan Zheng.Water Area Layout of Laoting County Center Fishing Port[J].Port Engineering Technology,2014(2):21-25.
- [14]LIU Ye,HAN Guang-dong,ZHANG Jun-jian,SHEN Ke-li.General Layout of Bayuquan Harbour Area,Yingkou Port[J].Port Engineering Technology,2006(2):10-11.
- [15]LIU Zhen,CHEN Zhi-chun.Study on wave condition of large scale port with submerged breakwater[J].Journal of Waterway and Harbour,2010,31(6):561-565.
- [16]Dai Jin.Analysis of Key Handling Techniques for Ore Transfer Terminal of Shulang Lake Island[J].Port Engineering Technology,2020(1):22-24,97.
- [17]于福志,;王文渊.Research on Layout Scheme of Inner Segment of Northern Fairway in Zhifu Port Area of Yantai Port[J].Port Engineering Technology,2014(3):31-33.
- [18]Wang Meiru.Inquiry on Design Method for Deep-water Breakwater[J].Port Engineering Technology,2010,47(3):1-7,41.
- [19]Wang Junhui,Zhang Cuiying.Marine Structure Design of Indonesia Power Plant Breakwater[J].Port Engineering Technology,2011,48(6):35-37.
- [20]Zhang Liang,An Dong.Research on Technological Design of Beira Fishing Port Reconstruction Project in Mozambique[J].Port Engineering Technology,2020(2):13-16.