王景灯.大直径后注浆灌注桩在极软岩地质条件码头中的应用[J].水运工程,2024,(11):195-201 |
大直径后注浆灌注桩在极软岩地质条件码头中的应用 |
Application of post-grouting pile with large diameter in wharfs with extremely soft rock geological condition |
|
DOI: |
中文关键词: cast-in-place pile post-grouting vertical bearing capacity of a single pile static load test |
英文关键词: |
基金项目: |
|
摘要点击次数: 55 |
全文下载次数: 0 |
中文摘要: |
The project of Berth 11 in Shimen'ao operation area of Xiuyu port area in Meizhou Bay Port,is a project constructing a 100,000 DWT bulk and general cargo wharf with relevant supporting facilities.The wharf is a high-piled beam-slab structure,which requires high foundation bearing capacity.In response to the geological condition of the lower part of the wharf foundation which is extremely soft rock,post-grouting technology is adopted at the pile toe of large-diameter cast-in-place piles,the static load test results of non-grouting and post-grouting cast-in-place piles is compared.The results show that the post-grouting pile can effectively improve the vertical bearing capacity of single pile,control the settlement of wharf,reduce the depth of foundation pile,shorten the project construction period,save the project cost,and has significant economic and social benefits. |
英文摘要: |
灌注桩;后注浆;单桩竖向承载力;静载荷试验 |
查看全文 查看/发表评论 下载PDF阅读器 |
关闭 |
|
|
|