刘江林,王 平,郭春龙.基于现状船闸利用方案的风光枢纽改扩建双线船闸总平面布置[J].水运工程,2024,(11):128-133
基于现状船闸利用方案的风光枢纽改扩建双线船闸总平面布置
Overall layout of double-line ship locks for renovation and expansion of Fengguang hub based on current utilization plan of ship lock
  
DOI:
中文关键词:  double-line ship lock  utilization plan  axis distance  plan layout
英文关键词:
基金项目:
作者单位
刘江林 中交第二航务工程勘察设计院有限公司湖北 武汉 430071 
王 平  
郭春龙  
摘要点击次数: 50
全文下载次数: 0
中文摘要:
      The renovation and expansion of the double-line ship lock project on the existing hub of the first-line ship lock face difficulties in being limited by existing buildings and structures,as well as difficulties in effectively utilizing the structure scheme of the first-line ship lock.Combined with the double-line ship lock project of Fengguang hub of Dongjiang waterway,two existing ship lock utilization ideas and corresponding layout schemes are put forward:Plan 1 using the old ship lock structure as the new ship lock approach channel and plan 2 using the old ship lock as the cofferdam during the construction period.Comparison is conducted on the advantages and disadvantages of the two schemes in the current structure utilization,construction difficulty,land acquisition area and so on.In view of the problem of large land acquisition area in Plan 2,the optimization measures are put forward that the main lock is arranged on the river side and the small lock is arranged on the bank side,so as to make full use of the water and land space of the current lock and effectively reduce the land acquisition area.
英文摘要:
      双线船闸;利用方案;轴线距离;平面布置