Abstract:To address dispersed data,inefficient collaboration,delayed risk identification,and poor reuse of experience in water transport engineering planning approval,a knowledge graph-driven intelligent management and control platform is developed.A three-layer architecture is adopted.By integrating approval workflows,BIM/GIS,historical documents and expert experience,a knowledge network of “task-document-spatial object-engineering object-expert-case” is constructed.A hybrid scheduling method integrating a genetic algorithm and constraint satisfaction,together with spatial conflict detection,rule-based reasoning,and dynamic warning,is used to achieve task optimization,material checking,spatial review,and risk identification.After six months of application at the Fodu Container Terminal Project,the average task-processing time decreased from 8.7 d to 3.2 d,cross-department response time from 16.5 h to 2.8 h,warning accuracy increased from 58.3% to 92.7%,and knowledge reuse rate from 21.6% to 76.8%.The platform links approval processes,spatial objects,and knowledge resources,improving task coordination,risk identification,and knowledge-assisted decision-making.The results provide a technical reference for the digital transformation of preliminary management in water transport engineering.