Numerical simulation on anti-inrush of foundation pit for Takeo Navigation Lock
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    茶胶通航闸为柬埔寨扶南德佐综合水利项目的重要梯级工程,位于洪泛区与人工运河的交界地段,该工程场区地下水以孔隙承压水为主,基坑开挖存在突涌破坏风险,因此基坑抗突涌稳定性验算为关键控制环节。现行规范多采用压力平衡理论开展抗突涌验算,该计算方式仅考虑土体自重力作用,忽略了土体自身强度对基坑抗突涌的贡献,难以精准反映工程实际受力状态。针对基坑抗突涌稳定问题,基于有效应力法,建立三维耦合固结有限元模型开展数值模拟研究,提出承压水作用下基坑土体突涌破坏机理,系统分析动态开挖全过程中土体应力分布特征与剪应力变化规律。结果表明,模拟基坑动态开挖过程中土体未出现拉应力区域,最大剪应力始终低于土体破坏临界值,基坑整体抗突涌稳定性满足要求。

    Abstract:

    The Takeo Navigation Lock is an important cascade project of the Funan Techo Integrated Water Resources Management Project in Cambodia,situated at the junction of floodplains and artificial canals.The groundwater in the project site is mainly pore-confined water,and there is a risk of sudden surge damage during excavation of the foundation pit.Therefore,stability verification of the foundation pit against sudden surges is a key control link.Current codes mostly adopt the pressure balance theory for anti-inrush calculation.This method only accounts for the self-weight of soil while neglecting the contribution of soil shear strength to anti-inrush performance,failing to accurately reflect the actual stress state of engineering works.In view of the anti-inrush stability of foundation pits,numerical simulations are performed based on the effective stress method by establishing a three-dimensional coupled consolidation finite element model.This study proposes the failure mechanism of foundation pit soil inrush under confined water pressure,and systematically analyzes the stress distribution characteristics and shear stress variation law of soil during the entire dynamic excavation process.The results show that there are no tensile stress zones in the soil during simulated dynamic excavation of the foundation pit,and the maximum shear stress is always lower than the critical failure threshold of the soil.The overall anti-inrush stability of the foundation pit meets the requirements.

    参考文献
    相似文献
    引证文献
引用本文

杜 军.茶胶通航闸基坑抗突涌数值模拟研究*[J].水运工程,2026(10):200-210.

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2026-10-16
  • 出版日期:
文章二维码