    摘要:

    湘桂运河是国家高等级航道网汉湘桂水运通道的重要组成部分,越岭段地形起伏大,生态环境约束强,针对常规明渠方案土石方开挖工程量大、高边坡防护难、占用耕地、影响生态环境等问题,采用临界高程分析法、通过能力建模与多方案技术经济比选方法,开展航道结构形式选择、隧洞布置、通过能力计算与船舶过洞方式研究。结果表明:以279.3 m为临界高程采用隧洞方案可减少土石方开挖约4 144万m3,且不占用耕地;双洞方案2040、2050年单向年通过能力分别达7 848万、12 534万t,单洞交替换向通航方案北上单向年通过能力分别为5 290万、8 450万t;电动牵引车牵引方案单艘船舶过洞耗时19.31 min,耗电量198.25 kW·h,可保障航行安全与效率。研究明确了岩溶地区大尺度通航隧洞的适配技术方案,可为工程建设及同类项目设计提供支撑与参考。

    Abstract:

    The Xianggui Canal is an important component of the Han-Xiang-Gui water transport passage within the national high-grade waterway network.Large topographic undulations and stringent ecological constraints existed in the mountain-crossing section.Aiming at the drawbacks of conventional open channel schemes,including massive earth-rock excavation volume,difficult high-slope protection,cultivated land occupation and adverse impacts on the ecological environment,critical elevation analysis,navigation capacity modelling,and technical-economic comparison of multiple alternatives are adopted to investigate the selection of waterway structural types,tunnel layout,navigation capacity calculation and vessel tunnel transit modes.The results show that the tunnel scheme with a critical elevation of 279.3 m reduces earth-rock excavation by approximately 41.44 million cubic meters without occupying cultivated land.For the twin-tunnel scheme,the one-way annual navigation capacities will reach 78.48 million tons and 125.34 million tons in 2040 and 2050,respectively.For the single-tunnel alternating bidirectional navigation scheme,the northbound one-way annual navigation capacities will reach 52.90 million tons and 84.50 million tons respectively.When the electric tractor traction scheme is adopted,a single vessel spends 19.31 minutes passing through the tunnel with a power consumption of 198.25 kW, and navigation safety and efficiency can be guaranteed.The suitable technical scheme for large-scale navigable tunnels in karst areas is clarified in this study,which provides support and reference for engineering construction and the design of similar projects.

    参考文献
    相似文献
    引证文献
引用本文

姜兴良.湘桂运河越岭段通航隧洞平面布置方案研究*[J].水运工程,2026(10):183-190.

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2026-10-16
  • 出版日期:
文章二维码