Abstract:Under scenarios of uncertain renewable energy output,scheduling decisions of traditional port integrated energy systems depend heavily on wind-photovoltaic forecast accuracy,resulting in poor scheduling stability and economy.The port multi-energy complementary coordinated control process is formulated as a multi-agent Markov decision model covering battery storage,grid interaction,and load response,and scheduling optimization strategy is achieved using the multi-agent deep deterministic policy gradient algorithm under a centralized training-decentralized execution framework.A 30-day simulation on a port system with 15 MW wind,12 MW photovoltaic,and 20 MW·h storage is conducted.The results show that under accurate forecast conditions,the proposed method achieves a renewable consumption rate of 99.99%,exceeding model predictive control(MPC) and rule-based control by 0.37 and 2.87 percentage points respectively,with curtailment,carbon emissions,and grid-tie fluctuation all reduced to the lowest;under strong disturbance with ±40% wind-photovoltaic forecast deviation,its consumption rate drops by only 0.07 percentage points,far better than MPC’s 0.52 percentage points,effectively avoiding MPC’s 118% monthly cost increase.The proposed scheduling method exhibits stronger robustness and engineering applicability under uncertain scenarios,providing effective technical support for intelligent scheduling of port integrated energy systems.