    摘要:

    针对内河散货码头前沿水域狭窄、堆场容量不足、作业效率较低及运营成本偏高等问题,以城陵矶老港11#泊位提质改造工程为依托,开展了铁水联运车船直取模式改造方案研究。通过将斜坡码头改造为浮码头、利用趸船长度延长水平输送距离、与现有铁水联运设施衔接等措施,构建了涵盖码头平面布置优化与装卸工艺系统升级的铁水联运车船直取模式改造方案;创新采用套筒式三通结构,实现了不同水平输送路径的动态实时切换。对“车船直取”与“船-堆场-车”两种工艺路线的效益进行了定量对比分析。结果表明:按年通过能力320万t、直取比例75%计,“车船直取”模式较“船-堆场-车”模式直接装卸成本降低约1.00元/t(降幅33%),综合装卸效率提升28%~78%,年减少碳排放约1 543 t。研究成果可为同类码头铁水联运系统的建设和升级提供技术参考与实践依据。

    Abstract:

    To resolve problems including narrow apron waters,insufficient storage yard capacity,low operational efficiency,and relatively high operating costs at inland river bulk cargo terminals,based on the quality upgrade & renovation project for Berth No.11 of old Yueyang Chenglingji Port,this study investigates a renovation scheme for the direct train-ship transfer mode of rail-water intermodal transport.This research is grounded in the quality upgrade & renovation project of Berth No.11 at the old Chenglingji Port.By adopting measures such as reconstructing the ramp wharf into a floating wharf,extending horizontal conveying distances by utilizing pontoon length,and connecting with existing rail-water intermodal facilities,it develops a renovation scheme of direct train-ship transfer mode for rail-water intermodal transport covering terminal layout optimization and handling process system upgrading.A sleeve-type three-way structure is innovatively implemented to enable dynamic real-time switching between distinct horizontal conveying paths.A quantitative comparative analysis is carried out to evaluate the benefits of the “direct train-ship transfer” process versus the “ship-yard-train” route.Results demonstrate that,based on an annual throughput of 3.2 million tons and a direct transfer proportion of 75%,the “direct train-ship transfer” mode cuts direct handling costs by approximately 1.00 CNY/t (a 33% reduction),raises overall handling efficiency by 28%-78%,and lowers annual carbon emissions by around 1,543 t compared with the “ship-yard-train” mode.The research findings can offer technical references and practical support for the construction and upgrading of rail-water intermodal systems at similar inland terminals.

    参考文献
    相似文献
    引证文献
引用本文

罗胜平,李少良,吴 娴,等.内河散货码头铁水联运车船直取模式改造方案研究*[J].水运工程,2026(9):86-93.

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2026-09-17
  • 出版日期:
文章二维码