一种利用既有桩基加固的“T 形”护岸结构在航道升级中应用分析*
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

浙江省交通运输厅课题项目(2022-GCKY-12)


Application analysis of a“T-shaped”revetment structure reinforced by existing pile foundations in waterway upgrading
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对内河限制性航道等级提升后原护岸结构不满足相关标准要求的情况,研究现状桩基加固护岸升级改造形式。结合既有桩基受力性能、挡墙墙身整体性等情况,提出一种利用既有桩基与新建桩基形成“T形”组合桩结构再次加固护岸的方法,通过在老挡墙后方间断设置基桩,将原单排桩受力体系转化为间隔的“门架”体系,优化桩基受力、减小桩基变形,满足结构要求。针对典型工程,利用PLAXIS 3D有限元软件对再次加固护岸结构桩前土体开挖过程进行数值模拟,分析桩基变形、内力等特点。计算结果表明:再次加固护岸结构安全系数提升约21%,既有桩基桩身弯矩分布更为均匀,弯矩峰值减少约23%,桩顶位移减少约58%,满足相关标准要求。同时,再次加固护岸不占用航道水域、不新增用地,具有较好的可行性与适宜性,可为类似航道升级工程提供参考。

    Abstract:

    In view of the situation where the original revetment structures fail to meet the requirements of relevant standards after the upgrading of inland restricted waterways,this paper studies the current renovation and reinforcement types of revetments using existing pile foundations.Considering the mechanical performance of existing pile foundations and the integrity of retaining wall structures,an approach is proposed to reinforce the revetment again by forming a “T-shaped” composite pile structure with existing and newly-built piles.By arranging foundation piles intermittently behind the original retaining wall,the original single-row pile force-bearing system is transformed into a spaced “portal frame” system,which optimizes the stress on pile foundations,reduces the deformation of the pile foundations,and meets structural requirements.For a typical project,the PLAXIS 3D finite element software is used to conduct numerical simulation of the soil excavation process in front of the piles of the re-reinforced revetment structure,and the characteristics such as pile foundation deformation and internal force are analyzed.The calculation results show that the safety factor of the re-reinforced revetment structure is increased by about 21%,the bending moment distribution of existing pile foundations is more uniform,the peak bending moment is reduced by about 23%,and the pile top displacement is decreased by about 58%,all of which satisfy the relevant standard requirements.Meanwhile,the re-reinforced revetment does not occupy waterway areas or require additional land,demonstrating good feasibility and applicability.This study can provide a reference for similar waterway upgrading projects.

    参考文献
    相似文献
    引证文献
引用本文

洪晶晶,郑国诞.一种利用既有桩基加固的“T 形”护岸结构在航道升级中应用分析*[J].水运工程,2026(7):144-149.

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2026-07-17
  • 出版日期:
文章二维码